The San Joaquin General Hospital Utility Realignment Project involves the realignment of the hospital's utility tunnel, which was constructed around 1930. The project includes the installation of new underground pre-fabricated and pre-insulated high pressure steam piping to bypass the portions of the tunnel that are failing. The project also includes an additive bid alternate item of work to install an empty electrical duct bank for future use adjacent to the new underground steam line system. The engineer's estimate of probable cost is within the range of $400,000 to $450,000.
• The project requires a mandatory pre-bid conference and project site visit.
• The bid submission date was January 17, 2014, at 5:00:00 PM EST.
• The bid tally form lists the prices of each vendor, with Champion Industrial Contractors being the lowest bidder at $485,000.00 for the base bid.
• The project involves the installation of new underground utility lines and the repair of the existing tunnel.
• The project is located at the San Joaquin General Hospital, located at 500 West Hospital Road, French Camp, CA 95231.