The Regents Retreat Demolition contract involves the complete demolition of a single‑story residential building at Salisbury University’s Regents Retreat campus, including utility disconnection, site grading, and waste management. The work must be performed in a single phase, adhere to strict site‑access constraints (the university President’s residence is onsite), and protect existing trees and shrubs. The contractor must submit a lump‑sum bid, provide required bonds and insurance, and comply with university, state, and federal safety and environmental regulations.
• Scope: full building demolition, utility termination, topsoil removal, site grading, and tree‑preservation demolition.
• Schedule: NTP projected 23 Apr 2026; substantial completion by 22 Jun 2026; final acceptance by 30 Jun 2026.
• Requirements: 5 % bid bond, 100 % performance & payment bonds, $2 M general liability insurance, live‑ink signatures, and compliance with OSHA, EPA, and university visitor‑parking policies.