This contract calls for the complete demolition and removal of the “S” ship‑unloader crane at Dock 1 of the McDuffie Coal Terminal, with optional awards for the “M” and “Z” cranes on Dock 3. The scope includes a feasibility study, a detailed engineering report, a final removal plan, all labor, equipment, safety and environmental compliance, and the disposal or salvage of materials. The contractor must secure a 5 % bid bond (max $10 k) and 100 % performance and payment bonds, meet a 30‑day exclusive access window for Dock 1, and finish the entire project within 90 calendar days. The award is a lump‑sum solicitation evaluated on cost, past performance, methodology, and schedule.