The contract is for drainage improvements for Ralston Acres Subdivision– 2018 in Harris County Precinct 1. The project includes the design of an enclosed storm sewer system, a wet bottom detention basin, and other improvements to alleviate flooding and strengthen resiliency in the area. The contract was awarded to Texas Materials Group, Inc. for $15,848,087. The scope of work includes clearing and grubbing, removing existing concrete, installing reinforced concrete culverts, and other related tasks. The project is expected to reduce flooding and improve the condition of County transportation and flood control infrastructure.
• The contract includes a detailed breakdown of the scope of work, including the installation of storm sewer systems, detention basins, and other drainage improvements.
• The project requires the removal of existing concrete, asphalt, and other materials, and the installation of new materials, including reinforced concrete culverts and pipes.
• The contract includes provisions for traffic control, erosion control, and other related tasks to ensure the safe and efficient completion of the project.
• The project is expected to have a significant impact on the community, reducing flooding and improving the overall quality of life for residents in the area.
• The contract includes a detailed payment schedule and requirements for the vendor, including the submission of invoices and the payment of fees.