Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›BID for M Street Rehabilitation North Bear Creek to Rambler

Awarded contract·City of Merced·California

BID for M Street Rehabilitation North Bear Creek to Rambler

$659kSingle Award
Contract source

Description

This contract concerns the rehabilitation of M Street between North Bear Creek Drive and Rambler Road in Merced, California. The scope is broken into 25 line items covering permitting, surveying, earthwork, erosion control, pavement removal and replacement (asphalt and concrete), curb and gutter work, sidewalk construction, utility adjustments, traffic detection loops, signage, and related project‑funding signage. Three contractors submitted unit‑price bids ranging from roughly $511 k to $659 k, but the award winner is not identified in the supplied material. The project is a typical municipal roadway rehabilitation funded by the city, requiring a mix of civil‑engineering and construction services. • 25 distinct work items encompassing site prep, pavement, concrete, utility, and traffic‑control elements. • Competitive open bidding with three bidders, each providing unit‑price breakdowns. • Estimated total contract value between $510 k and $660 k, with the highest bid at $658,500.

Attached files

Key dates

Bids closed
11/6/2018

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
117040

Contract value

$658,500

The bid results PDF lists three total bid amounts: $510,846.71 (United Pavement Maintenance), $620,073.00 (Rolfe/Granite), and $658,500.00 (George Reed). Since the contract award is not disclosed, the safest estimate is to use the highest submitted bid as a proxy for the upper bound of the contract value, i.e., roughly $658,500. This range ($511 k–$659 k) reflects the likely budget the City of Merced allocated for the full scope of work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Lowell·Massachusetts

Top match · 72%

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

72% match

STSRR PROJECT 21-7 STREETS IN TARA,OXFORD,SHERWOOD FOREST, DARRYL,BARD

Closes 11/3/2026Opened 10/6/2026

City of San Antonio·Texas

71% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

71% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Maple Grove·Minnesota

71% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

Kenosha County·Wisconsin

71% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Minot·North Carolina

70% match

BID NOTICE: 2026 STREET IMPROVEMENT ADDITIONAL AREAS

Closes 11/24/2026Opened 10/30/2026

City of Newton·Kansas

70% match

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026Opened 10/14/2026

City of Maple Grove·Minnesota

70% match

26-01 - Rice Lake Woods Area Street Rehabilitation

Closes 2/1/2027Opened 12/1/2025

Idaho Transportation Department·Idaho

70% match

Key No. 24250 1ST STREET WIDENING, AMMON

Closes 11/10/2026Opened 10/16/2026

Massachusetts City of Brockton·Massachusetts

70% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

San Bernardino County·California

70% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

Texas City of San Antonio·Texas

70% match

Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

NYS PRIDE of Ticonderoga·New York

69% match

RFP Opportunity - Rehabilitation of 85 & 105 Montcalm Street

Closes 11/5/2026Opened 10/15/2026

City of Stillwater·Oklahoma

69% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of Green Bay·Wisconsin

69% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Corning·California

69% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Stillwater·Oklahoma

69% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of Waco·Texas

69% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

City of Seattle·Washington

69% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

Georgia Bulloch County Board of Commissioners·Georgia

69% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

NYS Mark Cerrone, Inc.·New York

69% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/20/2026

Clark County·Nevada

68% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of San Antonio·Texas

68% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026