Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Lincoln Ave Grade Separation Proj 1818

Awarded contract·City of Yakima·Washington

Lincoln Ave Grade Separation Proj 1818

Won by Apollo Inc.$14.2MAwarded 12/16/2009Single Award
Contract source

Awarded vendors

  • Apollo Inc.

Description

This contract concerns the design‑build construction of a railroad grade‑separation at Lincoln Avenue in Yakima, Washington (Phase 2 of the city’s grade‑separation program). The scope includes extensive earthwork, utility relocation (storm‑water, sanitary sewer, water lines), structural concrete work for retaining walls (either a secant‑pile or diaphragm wall), pavement construction, traffic‑signal and illumination systems, and associated site‑development and environmental compliance items. The competitive sealed‑bid process opened on December 16 , 2009, and the City Manager awarded the contract to Apollo Inc. of Kennewick, WA. The estimated contract value, based on Apollo’s “Estimated Total” line item, is roughly $14.23 million, reflecting both the base bid and the lower‑cost wall alternative. The project is funded through Federal Aid (STPX‑NCPD‑000S(062)) and requires a 5 % performance bond from the contractor. No further dates, renewal terms, or contact details are supplied. • Scope: earthwork, utility installation, concrete retaining structures, paving, traffic‑signal & lighting, environmental compliance. • Funding: Federal Aid (STPX‑NCPD‑000S(062)). • Award: Apollo Inc., single‑vendor award, $14.23 M estimated total. • Procurement: Competitive sealed‑bid, bid opening/award on 12/16/2009.

Attached files

Key dates

Bids closed
12/16/2009
Intent to award
12/16/2009
Awarded
12/16/2009

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
Project 1818

Contract value

$14,229,650

The bid summary lists Apollo Inc.’s “Estimated Total” as $14,229,650.00, which represents the sum of the base bid plus the lower‑cost wall alternative. Since Apollo was the awardee and the contract is a fixed‑price award, the contract value is effectively this estimated total. No other adjustments, change orders, or options are noted, so the best estimate for the contract’s dollar value is approximately $14.23 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Texas Houston-Galveston Area Council·Texas

Top match · 57%

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

Narragansett Bay Commission·Rhode Island

56% match

Lincoln Septage Facility Improvements

Closes 11/4/2026Opened 9/23/2026

Oregon City of Eugene·Oregon

56% match

2026 ITB 18 Lincoln St: 5th Ave - 13th Ave (Eugene)

Closes 11/3/2026Opened 10/8/2026

City of Hastings·Nebraska

55% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

Town of Groton·Connecticut

55% match

LINCOLN SEPTAGE FACILITY IMPRV., CONTRACT 710.00C

Closes 11/12/2026Opened 9/26/2026

Georgia Department of Transportation (GDOT)·Georgia

55% match

RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad

Closes 11/9/2026Opened 10/8/2026

Town of Groton·Connecticut

54% match

NBC LINCOLN SEPTAGE FACILITY IMPRV., CONTRACT 710.00C

Closes 11/12/2026Opened 10/31/2026

NYS East Fishkill, Town of·New York

54% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Brazos Valley·Texas

54% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

Sherman ISD·Texas

54% match

Maintenance, Transportation, and Security General Services

Closes 6/29/2030Opened 5/15/2026

City of Lincoln·Nebraska

54% match

Security and Surveillance Installation, Maintenance, Service and Repair

Closes 7/30/2027Opened 6/4/2025

City of Lincoln·Nebraska

54% match

Master Agreement for General Construction Services

Closes 5/29/2027Opened 5/15/2024

Houston-Galveston Area Council·Texas

54% match

Freight Grade Separation Planning Studies Program Services

Closes 12/10/2026Opened 10/21/2026

City of Blue Hill, NE·Nebraska

54% match

Blue Hill, NE, Blue Hill Railway St. Paving Improvements Railway St. – Saline St. to York St., Blue Hill, Nebraska – 2026

Closes 11/9/2026Opened 10/23/2026

City of Shawnee·Kansas

53% match

Ordinance No. 3510

Closes 2/5/2027Opened 11/5/2024

Georgia Cobb County Board of Education·Georgia

53% match

Compton ES Renovation, B27052

Closes 12/3/2026Opened 10/29/2026

City of Charlotte·North Carolina

53% match

Train Control Grade Crossing Spare Parts Contract

Rolling / TBD closeOpened 4/1/2026

City of Shawnee·Kansas

53% match

Ordinance No. 3517

Closes 3/5/2030Opened 3/4/2025

Judson Independent School District·Texas

53% match

2026-06-17 - Addenda #1

Rolling / TBD closeOpened 1/2/2026

City of Shawnee·Kansas

53% match

Ordinance No. 3519

Closes 4/1/2030Opened 4/1/2025

Maryland Baltimore County Government·Maryland

53% match

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

City of Cincinnati·Ohio

53% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

LAUSD·California

53% match

FORMAL 2710067 CHEREMOYA ES - ADA BARRIER REMOVAL

Closes 12/2/2026Opened 10/28/2026

Miami-Dade County·Florida

53% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Sherman ISD·Texas

53% match

Maintenance, Transportation, and Security General Services

Closes 6/29/2030Opened 6/10/2026