This contract concerns the design‑build construction of a railroad grade‑separation at Lincoln Avenue in Yakima, Washington (Phase 2 of the city’s grade‑separation program). The scope includes extensive earthwork, utility relocation (storm‑water, sanitary sewer, water lines), structural concrete work for retaining walls (either a secant‑pile or diaphragm wall), pavement construction, traffic‑signal and illumination systems, and associated site‑development and environmental compliance items. The competitive sealed‑bid process opened on December 16 , 2009, and the City Manager awarded the contract to Apollo Inc. of Kennewick, WA. The estimated contract value, based on Apollo’s “Estimated Total” line item, is roughly $14.23 million, reflecting both the base bid and the lower‑cost wall alternative. The project is funded through Federal Aid (STPX‑NCPD‑000S(062)) and requires a 5 % performance bond from the contractor. No further dates, renewal terms, or contact details are supplied.
• Scope: earthwork, utility installation, concrete retaining structures, paving, traffic‑signal & lighting, environmental compliance.
• Funding: Federal Aid (STPX‑NCPD‑000S(062)).
• Award: Apollo Inc., single‑vendor award, $14.23 M estimated total.
• Procurement: Competitive sealed‑bid, bid opening/award on 12/16/2009.