The contract is for the construction of approximately 1,348 linear feet of cured-in-place pipe (CIPP) within existing 8-inch and 10-inch clay and concrete sewer. The prime contractor or subcontractor must have a minimum field experience for cured-in-place pipe (CIPP) installation of three successfully completed projects totaling a minimum of 5,000 linear feet of mainline using the proposed CIPP technology. The Engineering estimates are Schedule ‘C’ - $260,000; Schedule ‘E’ - $149,000; and Schedule ‘F’ - $188,000.
• The contract involves video inspecting, locating and reconnecting, replacing or rerouting 4-inch and 6-inch sewer service and other work as shown on the Plans.
• The City of Corvallis encourages small, minority, and women-owned businesses to submit bid.
• The contract was awarded to Iron Horse LLC with a base bid total of $597,440.00.