The contract is for the construction of a maintenance building at the Culmback Dam. The project includes the installation of an engineered structural metal frame building on a new structural concrete slab foundation, as well as the decommissioning and removal of an existing vault toilet. The contract was awarded to TRICO Companies, LLC, with a bid price of $459,800.00. The project is located in Snohomish County, Washington, and the bid was submitted through the Public Purchase website.
• The contract includes the installation of a new storm drain system and the coating of the slab.
• The project requires the bidder to attend one of two mandatory pre-bid meetings.
• The contract documents include an engineer's estimate of $400,000.00.
• The bid opening was held on June 10, 2021, at 2:00 p.m.
• The contract is subject to change and the scheduled bid award is estimated to be on July 6, 2021.