The City of Independence, MO is soliciting bids for a roof replacement project. The project involves replacing roofs on Water Pollution Control Department facilities buildings. The contract was awarded to Midwest Storm Restoration based on the lowest and best bid. The project has two options: APP Modified Bitumen Roofing System and TPO Single-Ply Adhered Roofing System. The anticipated project completion dates are October 2017, January 2017, and December 2017 for the different options.
• The contract involves replacing roofs on multiple buildings, including the Sludge Process and Control Building, Garages, Primary Sludge Pump Station, Secondary Sludge Pump Station, Rock Creek Pump Station, and Rock Creek Pump Station Chlorine Building.
• The project requires the contractor to provide materials, equipment, labor, supervision, and all else necessary to complete the work.
• The contract has a total price of $749,980.00 for Option 1 and $621,000.00 for Option 2.
• The contract has a unit cost for various items, including wood blocking replacement, metal deck replacement, removal of deteriorated concrete topping, and flashing replacement.