The Raintree and Devonshire Mill and Overlay Project involves the milling and resurfacing of sixteen residential asphalt streets in the Raintree and Devonshire subdivisions. The project includes approximately 30,000 square yards of 2” depth full width milling, 3,500 tons of 2” depth asphalt surface placement, 38 ADA sidewalk ramps, 600 linear feet of sidewalk removal and replacement, and 12,000 linear feet of spot curb replacement. The bid opening took place on April 10, 2018, and the engineer's estimate for the project was $1,016,474.50. The following are key aspects of the project:
• Milling and resurfacing of residential asphalt streets
• Installation of ADA sidewalk ramps
• Removal and replacement of sidewalks and curbs
• Asphalt surface placement
• Spot curb replacement