Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›Raintree and Devonshire Mill and Overlay Project

Awarded contract·City of Olathe·Kansas

Raintree and Devonshire Mill and Overlay Project

Won by Phoenix Concrete & Underground LLC +4 more$1MMultiple Award
Contract source

Awarded vendors

  • Phoenix Concrete & Underground LLC
  • Kansas Heavy Construction, LLC
  • O'Donnell & Sons Construction Co., Inc.
  • Freeman Concrete Construction, LLC
  • J. M. Fahey Construction Company

Description

The Raintree and Devonshire Mill and Overlay Project involves the milling and resurfacing of sixteen residential asphalt streets in the Raintree and Devonshire subdivisions. The project includes approximately 30,000 square yards of 2” depth full width milling, 3,500 tons of 2” depth asphalt surface placement, 38 ADA sidewalk ramps, 600 linear feet of sidewalk removal and replacement, and 12,000 linear feet of spot curb replacement. The bid opening took place on April 10, 2018, and the engineer's estimate for the project was $1,016,474.50. The following are key aspects of the project: • Milling and resurfacing of residential asphalt streets • Installation of ADA sidewalk ramps • Removal and replacement of sidewalks and curbs • Asphalt surface placement • Spot curb replacement

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
3-P-013-17

Contract value

$1,000,000

The contract value can be estimated based on the bids provided, with the lowest bid being $919,732.41 and the highest bid being $1,224,898.50. The engineer's estimate for the project was $1,016,474.50. Considering these values, a reasonable estimate for the contract value would be around $1 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Huron·South Dakota

Top match · 68%

2026-03 Milling and Overlay BT

Closes 12/31/2026Opened 2/18/2026

City of Slidell·Louisiana

67% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

City of Palmdale·California

66% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026

Connecticut Town of Cheshire·Connecticut

65% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Burlington Township·New Jersey

65% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

City of Johnson·Arkansas

65% match

City Street Overlay and Striping Improvements

Closes 11/5/2026Opened 10/18/2026

Massachusetts City of Newburyport·Massachusetts

64% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

Maryland Town of Port Deposit·Maryland

64% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

Georgia Bulloch County Board of Commissioners·Georgia

64% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

Tuolumne County·California

64% match

Mechanical Site Prep: Cherry West Item 1

Closes 11/13/2026Opened 10/16/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of Charlotte·North Carolina

64% match

Perth-Milton Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/15/2028

Tacoma·Washington

64% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

Agency of Transportation - Contract Administration·Vermont

64% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/29/2026

Town of Cutler Bay·Florida

64% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

City of North Charleston·South Carolina

64% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Town of Exeter·New Hampshire

63% match

Swasey Parkway Landscape Maintenance RFP

Closes 11/17/2026Opened 10/29/2026

Maryland Town of Riverdale Park·Maryland

63% match

Town Lawn Mowing and Maintenance Services Bid No. 2026 – 006

Closes 11/20/2026Opened 10/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

63% match

Abandoned Mine Reclamation Project – North Liberty South (Slippery Rock Township, Butler County & Liberty Township, Mercer County)

Closes 12/3/2026Opened 10/30/2026

Delta Airport Consultants·Virginia

63% match

COMING SOON - Winchester, VA - Winchester Regional Airport - Northside Site Preparation (25023)

Rolling / TBD closeOpened 6/1/2026

Clay County·Florida

63% match

County Road 220 Phase 2 – Milling and Resurfacing

Closes 11/30/2026Opened 10/15/2026

City of Santa Rosa·California

63% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Washakie County Conservation District·Wyoming

63% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

City of North Charleston·South Carolina

63% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026