The contract is for the remodeling and reconfiguring of spaces in the lower level of the LA building at Utah Valley University. The project includes the creation of an ASL lab and studios, as well as the installation of interpretation booths, lighting, and carpet. The contract was awarded through an Invitation for Bid (IFB) process, and the bid results table lists the prices submitted by the different vendors. The contract is expected to be completed by April 25, 2025.
• The project consists of remodeling and reconfiguring spaces in the lower level of the LA building.
• The contract was awarded through an IFB process.
• The bid results table lists the prices submitted by the different vendors.
• The contract is expected to be completed by April 25, 2025.
• The project includes the creation of an ASL lab and studios.
• The project includes the installation of interpretation booths, lighting, and carpet.