This contract calls for the complete demolition of existing structures at 5661 Hunter Street, Theodore, AL, using wet‑demolition methods and includes full site remediation, utility cap‑off, and environmental compliance. The contractor must provide all labor, equipment, erosion‑control BMPs, and disposal of hazardous materials (lead‑based paint, asbestos) at their own cost, secure all required permits, and complete the work within a 30‑day window after receipt of a written Notice to Proceed. Detailed close‑out documentation—including photographs, waste shipment records, affidavits, and a newspaper notice of final completion—is required before final payment.
• Wet demolition of all structures, removal of footings, slabs, and vegetation up to 8‑in. caliper.
• Cap‑off of water, sewer, and gas lines; complete site clean‑up and permanent stabilization (topsoil, seeding, mulching).
• Compliance with lead‑based paint, asbestos, and storm‑water regulations; provision of insurance, E‑Verify, and required close‑out documents.