Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›FPM - University Auditorium Interior Renovation - 2024

Awarded contract·Wayne State University·Michigan

FPM - University Auditorium Interior Renovation - 2024

Won by Sachse Construction$1.5MSingle Award
Contract source

Awarded vendors

  • Sachse Construction

Description

The DeRoy Auditorium Interior Renovation contract at Wayne State University calls for a comprehensive interior fit‑out of the lower‑ and main‑level auditoriums on the Detroit campus. The scope includes demolition of existing finishes, installation of new interior finishes, seating, lighting, audiovisual (AV) equipment, acoustic wall paneling, and related mechanical/electrical upgrades, together with required temporary facilities, site protection, cleaning, and close‑out documentation. The solicitation was a single‑award, lump‑sum bid with a mandatory pre‑bid conference, multiple addenda extending the bid deadline, and a substantial‑completion deadline of 30 Nov 2024. The contract was awarded to Sachse Construction, a qualified contractor meeting WSU’s wage‑rate, bonding, insurance, and EMR requirements. • Interior demolition, new carpet tile, paint, acoustic panels, and fixed seating installation. • Full AV/technology integration (projectors, screens, speakers, control panels, networking). • Electrical power distribution, conduit work, and necessary permit acquisition. • Strict compliance with Wayne State wage‑rate schedule, smoke‑free campus policy, and diversity‑spend reporting.

Attached files

Key dates

Bids closed
8/6/2024
Contract modified
7/30/2024
Ends
11/30/2024
Duration
4 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
023-409200

Contract value

$1,500,000

No dollar amount is disclosed in any of the documents. The project involves roughly 7,400 sf of auditorium space, with demolition, new finishes, seating, lighting, AV systems, and acoustic treatments. Comparable university auditorium interior renovations typically range from $1.2 M to $2.0 M depending on material quality, AV equipment complexity, and labor rates. Considering Wayne State’s location in Detroit (mid‑range labor costs) and the inclusion of a full AV integration package, a reasonable midpoint estimate is around $1.5 million. This estimate also aligns with the “Large” project category ($250 k–$2 M) indicated in the pre‑qualification matrix.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

University of North Dakota·North Dakota

Top match · 72%

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

City of Flowood·Mississippi

72% match

Flowood Underwood Auditorium

Closes 11/12/2026Opened 10/7/2026

Columbia Public Schools·Missouri

72% match

RFP 2717 lange middle facs classroom renovation

Closes 11/10/2026Opened 10/17/2026

University of North Dakota·North Dakota

72% match

FM362 UND SMHS Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

Texas Angelo State University·Texas

72% match

26-004 RFCSP Porter Henderson Library Restroom Renovation

Closes 11/12/2026Opened 10/15/2026

University of North Texas System·Texas

70% match

RFQ769-27-1028CS Sycamore Hall Stewardship Renovation

Closes 11/20/2026Opened 10/21/2026

University Of Texas At Austin·Texas

70% match

KIN CP2001827 North Tower Rm Renovations

Closes 11/13/2026Opened 10/12/2026

The University of North Carolina·North Carolina

70% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

70% match

Panera Bread Bakery Cafe Renovation

Closes 11/12/2026Opened 10/12/2026

University of Louisville·Kentucky

70% match

Kosair Charities Pediatrics First Floor Renovation

Closes 11/18/2026Opened 10/26/2026

University of Mississippi Medical Center·Mississippi

70% match

5 North Renovation

Closes 11/5/2026Opened 10/5/2026

Michigan Ann Arbor Public Schools·Michigan

69% match

IFB 27.0006 Scarlett & Clague Auditorium Renovation

Closes 11/18/2026Opened 10/27/2026

Fashion Institute of Technology·New York

69% match

IFB C1762 - Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

Massachusetts State College Building Authority·Massachusetts

69% match

RFQ/P Design and Construction Management Services - Framingham State University - Linsley Hall Repurposing

Closes 11/4/2026Opened 10/14/2026

University System of New Hampshire·New Hampshire

69% match

UNH Lord Hall Building Entrance Modifications

Closes 11/20/2026Opened 10/21/2026

Toledo Area Regional Transit Authority·Ohio

69% match

Transit Hub Interior Renovations

Closes 11/6/2026Opened 9/9/2026

The Ohio State University·Ohio

69% match

OSU-240175, Research Admin Bldg - 4th Floor Renovation

Closes 11/19/2026Opened 10/28/2026

University of Louisville·Kentucky

69% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

The University of North Carolina·North Carolina

68% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

College of Charleston·South Carolina

68% match

Berry Residence Hall and Honors Program Renovation - Phase G

Closes 11/12/2026Opened 10/21/2026

South Carolina

68% match

Russell House Student Union Expansion and Reno

Closes 11/18/2026Opened 10/29/2026

U.S. Department Of The Interior·District of Columbia

68% match

Z--Lactation Room renovation at Udall Building

Closes 11/2/2026Opened 10/22/2026

Michigan Bridgman Public Schools·Michigan

67% match

F.C. Reed Middle School 2027 Renovations

Closes 11/12/2026Opened 10/15/2026

UCLA Capital Programs·California

67% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 20 - Interior Signage)

Rolling / TBD closeOpened 10/23/2026

City and County of Denver·Colorado

67% match

RFP: Boettcher Concert Hall Renovation CM/GC

Closes 12/2/2026Opened 10/22/2026