The City of Corvallis, Engineering Division, is seeking bids for the Woodland Tank Recoat project. The project involves structural and seismic upgrades to a 125,000-gallon elevated steel water storage reservoir, including removing and replacing the existing steel structural bracing system, replacement of select reservoir appurtenances, installing a coating system on the new structural steel fabrications, complete coating repairs to existing steel surfaces, and other work as shown on the plans. The engineering estimate for the project is $701,000. The bid tabulation lists three bidders: T Bailey, Inc., Purcell P&C, LLC, and Long Painting Company. The total bid amount, including bid alternates, ranges from $627,177.52 to $699,211.22.
• The project requires pre-qualification of metal fabricators and tank painting contractors.
• A mandatory pre-bid meeting was held on September 12, 2017.
• The bid submission date was September 26, 2017.
• The bid award date was November 20, 2017.
• The project involves various work items, including mobilization, demobilization, bonds, insurance, seismic upgrade, interior maintenance painting, exterior maintenance painting, and miscellaneous metalwork items.