The Parker Pool Improvement Project involves various renovations, including the demolition and reconstruction of the restroom building, shade structure, and existing ramp. The project also includes repainting the swimming pool and pump room improvements. The contract was awarded to 8A Builders, LLC, with a base bid amount of $653,408.83 and an additive no. 1 amount of $143,125.00. The project requires the contractor to provide all necessary tools and equipment and to complete the work in accordance with the scope of work and existing materials quality. The contractor is also responsible for removing and disposing of demolished materials and debris.
• The project includes a pre-bid conference, which was scheduled for March 6, 2024.
• The bid submission deadline was March 12, 2024, at 3:00 PM EDT.
• The contract documents, including the IFB, addenda, and bid tabulation, are available for download.
• The project requires the contractor to submit a lump sum bid and provide a breakdown of itemized costs.
• The contractor must also submit various documents, including a bid bond, certificate of corporate principal, and non-collusion affidavit.