This contract is for the preparation of final plans, specifications, and estimates (PS & E) for the Collin County Outer Loop, Segment 3B East of Preston Rd (SH 289) to Custer Rd (FM 2478). The contract was awarded to Jacobs Engineering Group Inc. The original contract sum was $861,025.43, and the new contract sum including this amendment will be $870,045.03. The contract is for the design of the CCOL Service Road. Key aspects of the contract include the preparation of final plans, specifications, and estimates, and the contract sum.
• The contract is for the design of the CCOL Service Road.
• The contract was awarded to Jacobs Engineering Group Inc.
• The original contract sum was $861,025.43.
• The new contract sum including this amendment will be $870,045.03.