Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Engineering Services
  5. ›East Marginal Way S Preservation (FHWA)

City of Seattle·Washington

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026$200k – $300kRequest for Information
Get bids like this by emailBid source

Description

This memorandum provides geotechnical analysis and foundation design recommendations for four new traffic signal poles at the East Marginal Way South and Corson Avenue South intersection in Seattle, WA. The scope includes a review of existing geotechnical data, identification of site features (soil zones, contamination, groundwater), classification of the subsurface as “Lower Strength Soil,” and detailed construction considerations for drilled‑shaft foundations, including utility locate procedures, casing, concrete placement, and potential obstructions. The client (SDOT) will use these recommendations to develop design specifications and construction documents for the signal‑pole project, which is part of a larger pavement overlay and bike‑lane improvement effort. • Review of existing geotechnical information and mapping of site features. • Soil strength classification and recommendation of “Lower Strength Soil” design zone. • Construction guidance for drilled‑shaft foundations (casing, slurry, concrete placement, obstruction handling). • Utility locate recommendations and back‑fill procedures. • Limitations of the study and optional follow‑on services (RFI review, submittal review, construction support).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Abner Gallardo

[email protected]

(206) 684-8130

Key dates

Opened
10/14/2026
Questions due
11/12/2026
Closes
11/18/2026

Last updated

Details

Type
Request for Information
Industry
Engineering Services
NAICS
541330
Solicitation №
PW#2025-057

Budget estimate

$200,000 – $300,000

The memo is part of an on‑call structural services contract (Project W3Y22700) with an engineer’s estimate of $10.8 million for the overall roadway improvements. Consulting firms typically charge 1–3 % of the total project estimate for geotechnical design and advisory services of this scope. Assuming a 2 % fee, the budget range would be roughly $200,000 to $300,000. The final amount could vary based on the extent of optional follow‑on services (RFI handling, construction support) and the negotiated hourly or fixed‑price rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Seattle·Washington

Top match · 80%

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Seattle·Washington

80% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

79% match

DOT&PF Notice of Geotechnical Investigation: Ketchikan Tongass Avenue & Water Street Viaducts

Rolling / TBD closeOpened 8/17/2026

Maryland Baltimore County Government·Maryland

77% match

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

Manatee County - Purchasing Division·Florida

76% match

GEOTECHNICAL ENGINEERING SERVICES FOR 60TH AVE EAST (BUFFALO RD) SEGMENT 2 AND SEGMENT 3 - 69TH ST. EAST INTERSECTION IMPROVEMENTS PROJECT NO. 6083163, 6083164

Closes 11/5/2026Opened 10/7/2026

Town of Prosper·Texas

76% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

Town of Prosper·Texas

76% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Transportation·District of Columbia

75% match

Broad Agency Announcement: Research to Support FHWA’s Office of Infrastructure Research and Development

Closes 9/13/2028Opened 6/9/2026

U.S. Department Of Transportation·Washington

75% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

Massachusetts Town of Spencer·Massachusetts

75% match

Engineering Peer Review Proposals

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Defense·Utah

75% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026

Butler County·Ohio

75% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

Nevada Government·Nevada

75% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Lexington County·South Carolina

75% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

City of Seattle·Washington

75% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

City of Fairlawn·Ohio

74% match

Smith Road SRTS – Fairlawn (PID 120279)

Closes 11/9/2026Opened 10/16/2026

Alaska Department of Natural Resources – Division of Mining, Land and Water (DMLW)·Alaska

74% match

LAS 36106 KWH Constructors, Inc. Land Use Permit Application for Staging McKinley Village Pit

Rolling / TBD closeOpened 8/18/2026

Hamilton County, IN·Indiana

74% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

Washington Fish and Wildlife, Department of·Washington

74% match

ROUTE CONDITIONS ASSESSMENTS

Closes 11/11/2026Opened 9/25/2026

State of Hawaii Department of Transportation – Highways Division·Hawaii

74% match

STP-0300(236) ASPHALT PAVEMENT PRESERVATION, RESURFACING, RECONS

Closes 11/20/2026Opened 10/16/2026

Municipality of Anchorage·Alaska

74% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

Town and County of Nantucket·Massachusetts

74% match

Sparks Avenue Sidepath Improvements Project

Closes 11/19/2026Opened 10/19/2026

Idaho Transportation Department·Idaho

74% match

Key No. 24698 DISCOVERY WAY, US 20/26 TO BRIDGER ST, BOISE

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of The Interior·Colorado

74% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Washington County, WI·Wisconsin

74% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026