The contract is for the construction of the SLCC Jordan and Redwood Piping Upgrades project. The project involves tying the main water line together in a loop at the Jordan campus and replacing the main shutoff valves for the Redwood campus loop. The contract was awarded to US Mechanical, with a total bid of $238,250.00. The estimated delivery date is January 1, 2025.
• The contract is for a construction project.
• The project involves piping upgrades at two campuses.
• The contract was awarded to a single vendor.
• The total bid for the contract is $238,250.00.
• The estimated delivery date is January 1, 2025.