Awarded vendors
- Allegheny Installations
Description
The contract is for the replacement of bathroom floors at the Kane Glen Hazel II location. The vendor, Allegheny Installations, was awarded the contract with a bid of $11,500.00. The contract period is from December 1, 2017, to March 31, 2018. Key aspects of the contract include:
• The contract is for a lump sum bid of bathroom floor installation in accordance with specifications.
• The estimated cost of the project is $11,500.00.
• The contract was awarded to Allegheny Installations, who submitted the most advantageous quotation.
• The contract period is for 120 days, from December 1, 2017, to March 31, 2018.