This contract is for drainage improvements in the Morningside Place Subdivision for the Harris County Flood Control District. The project involves improving the conveyance of the storm sewer system and reducing street ponding. The contract was awarded to Environmental Allies, LLC for a total amount of $1,845,411. The project is expected to provide better drainage along the roadways and increase the use of available detention within the existing basins.
• The project includes the removal and disposal of existing infrastructure, including bridges, culverts, and driveways.
• The installation of new reinforced concrete pipes, manholes, and inlet protection barriers.
• The modification of the outfall pipe and the lowering of the static water surface elevation in the existing detention pond.
• The addition of street inlets and junction boxes to optimize flow.
• The provision of construction management and materials testing services by the Flood Control District staff.