The City of Roseville is soliciting bids for the design and fabrication of relay panel replacements for the Roseville Electric Division. The contract was awarded to Schweitzer Engineering Laboratories, Inc. and Keystone Electrical, with total lump sum bids of $187,590.00 and $215,721.93, respectively. The bid bond was required, and addendums 1 and 2 were issued. The key information to note is that the contract is for pre-wired relay panels, and the city is looking for vendors to design and fabricate these panels. Some key points to consider are:
• The contract is for a specific product, pre-wired relay panels, which requires specialized design and fabrication.
• The city has issued addendums, which may indicate changes to the original bid requirements.
• The bid bond is required, which may indicate a level of risk associated with the contract.
• The contract has been awarded to two vendors, which may indicate a level of competition for the contract.