This contract awards the City of Yakima the construction of a new 40th Avenue sidewalk stretch from Walnut Avenue to north of Chestnut Avenue. The scope includes demolition of existing curb, excavation, installation of concrete sidewalks (both 4‑in. and 6‑in. sections), curb and gutter, stormwater control, traffic control, and related ancillary items such as mailbox supports and a crosswalk signal. The winning bidder, Allstar Construction Group, Inc., submitted a lump‑sum bid of $203,238.
• 40th Avenue sidewalk construction covering roughly 600 sq yd of concrete work and associated site preparation.
• Comprehensive civil‑engineering tasks: SPCC plan, traffic control, excavation, concrete curb/sidewalk, asphalt driveway approaches, and modular block wall.
• Competitive bid process with three bidders; award granted on 27 Aug 2018.