The City of Palm Bay, Florida, issued a solicitation for the replacement of culvert pipes in Units 11 and 15. The project involves the removal, disposal, re-installation, and restoration of 25 cross and side drain culvert pipes. The contractor is required to provide all incidentals necessary to complete the project, including utility relocations, material furnishings, and restoration work. The contract was awarded to Florida Site Contracting for an amount of $277,114.00.
• The project is located in the City of Palm Bay's Port Malabar Unit (PMU) 11 and 15.
• The contractor is required to perform a pre-construction video to document existing conditions prior to mobilization.
• The contractor is responsible for all Maintenance of Traffic (MOT) costs required for the project.
• The contract includes a 10% bid bond.