This contract concerns the demolition of an abandoned, damaged CMU‑block structure located at 1567 Plover Street in Mobile, Alabama. The City of Mobile’s Municipal Enforcement Department issued an open RFQ (ME‑470‑17) requiring wet‑demolition methods, utility capping, complete site clearing, erosion‑ and sediment‑control BMPs, hazardous‑material handling, and post‑demolition site stabilization. The successful bidder, NU VISION CONSTRUCTION INC., must complete the work within fifteen calendar days of receiving a Notice to Proceed and submit all required close‑out documentation, including photographs, waste‑shipment records, and proof of final‑notice publication.
• Wet demolition of the structure, footings, and slabs with all debris removed.
• Utility disconnection and capping (sewer, water, gas) plus installation of temporary and permanent erosion control measures.
• Compliance with lead‑based paint, asbestos, and hazardous‑waste disposal regulations; submission of before‑and‑after photos and waste‑shipment records.