The contract is for the removal and replacement of two roof-mounted roof-top units at the South Jordan Recreation Center, including miscellaneous patching and repairs to the existing roof system. The contract was awarded to Desert Development LLC, with a base bid of $207,314.90 and a total bid of $437,360.90. The scope of work includes the installation of new curbs, plumbing, ducting, and electrical penetrations as needed.
• The contract is for a construction project
• The project involves the replacement of roof-top units
• The contract was awarded to Desert Development LLC
• The total bid amount is $437,360.90
• The contract includes miscellaneous patching and repairs to the existing roof system