Awarded vendors
- FBD Vanguard Construction
- McGuire & Hester
- Robert A. Bothman Construction
- Sierra National Construction, Inc.
- Sposeto Engineering, Inc.
- Central Valley Engineering & Asphalt, Inc.
- Teichert Construction
- B&M Builders, Inc.
Description
The contract is for the Morse Avenue Sidewalk Improvements project, which includes the furnishing of all labor, materials, and equipment for clearing and grubbing, installation of curb, gutter, sidewalk, ramps, installation of drainage facilities, street light installation, pavement removal, slurry seal, roadway striping, relocation of roadway signs, roadway excavation, and other work as described in the Special Provisions and Plans. The estimated construction cost is $1,270,000. The contract was awarded to the apparent low bidder, FBD Vanguard Construction, with a total bid of $1,171,255.00.
• The project location is on Morse Avenue, with the limits of the project extending from Hurley Way to Arden Way.
• The contractor license required is General Engineering Contractor, Class A.
• A pre-bid meeting was held on October 27, 2021, via Skype.
• The bid opening was live-streamed and recorded for later viewing.
• The contract documents, including the Special Provisions, Plans, and Notice to Contractors, are available for download.