Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Construction
  5. ›BID – Choctaw Point Container Terminal – Phase V Dock…

Awarded contract·Alabama State Port Authority·Alabama

BID – Choctaw Point Container Terminal – Phase V Dock Extension

Won by Orion Construction, LLC$75MAwarded 5/11/2026Single Award
Contract source

Awarded vendors

  • Orion Construction, LLC

Description

The project involves the design, construction, and commissioning of Phase V of the Choctaw Point Container Terminal dock extension at the Port of Mobile, Alabama. The scope encompasses demolition of existing marine and landside structures, installation of new steel “Z” pile and concrete pile foundations, construction of a combination wall, crane‑rail system, fender and mooring hardware, extensive concrete work (piles, decks, paving), back‑land earthwork, utility installation (medium‑voltage switchgear, ductbanks, lighting), and related site‑cleanup. The contract is a competitive sealed‑bid, lump‑sum award with a performance bond equal to 100 % of the contract price and a liquidated‑damages clause of 0.033 % per day for late completion. The contract duration is 880 calendar days after receipt of the Notice to Proceed.

Attached files

Key dates

Bids closed
4/9/2026
Intent to award
5/11/2026
Awarded
5/11/2026
Contract modified
3/31/2026
Duration
880 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
11411-06

Contract value

$75,000,000

The specification booklet lists thousands of linear feet of pile work, hundreds of cubic yards of concrete, extensive electrical equipment (multiple 30 MVA switchgear units, transformers, ductbanks), crane‑rail and fender systems, and back‑land earthwork exceeding 20,000 CY. Similar large‑scale port‑dock projects in the Gulf region routinely range from $50 M to $100 M. Considering the extensive pile and concrete quantities (e.g., ~100,000 LF of bearing piles, ~10,000 CY of concrete decks) and the high‑value electrical equipment, a conservative midpoint estimate of $75 million is reasonable. This estimate also aligns with the liquidated‑damages schedule (which anticipates a contract well above $600 k) and the requirement for a 100 % performance bond, implying a sizable contract value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Manatee County Port Authority·Florida

Top match · 73%

Container Yard Phase 3

Closes 11/20/2026Opened 10/23/2026

New York City Health and Hospitals Corporation·New York

70% match

Bid Extension: Loading Dock + Morgue at South Brooklyn Health, Brooklyn, NY

Closes 11/4/2026Opened 9/2/2026

Port of Los Angeles Harbor Department·California

69% match

Pre-Development Agreement Marine Container Terminal Pier 500

Closes 12/10/2026Opened 10/1/2025

Louisiana Capital Area Transit System·Louisiana

69% match

2222 Florida Terminal Improvement Project

Closes 12/7/2026Opened 10/22/2026

Connecticut Town of Westport·Connecticut

69% match

Compo Marina Piers - Utility Platform

Closes 11/19/2026Opened 10/23/2026

Port of Long Beach·California

68% match

HD-S3215 Pier B On-Dock Rail Support Facility Rail Yard Access Improvements

Closes 12/15/2026Opened 10/29/2026

U.S. Department Of Defense·Washington

68% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 6/15/2026

City & Borough of Juneau·Alaska

68% match

Aurora Harbor Drive Down Float

Closes 11/10/2026Opened 9/22/2026

Port of Long Beach·California

68% match

HD-S3180 Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening

Closes 11/17/2026Opened 9/17/2026

Georgia Chatham Area Transit Authority·Georgia

68% match

CAT PLANT RIVERSIDE FERRY DOCK AND SHELTER

Closes 11/6/2026Opened 10/6/2026

Virginia Institute of Marine Science·Virginia

67% match

VIMS CONSTRUCT R/V VIRGINIA (RVVA) BERTHING

Closes 11/11/2026Opened 10/9/2026

U.S. Department Of Defense·Washington

67% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 9/30/2026

County of Accomack·Virginia

67% match

IFB 775 - Parker Creek Dock and Ramp

Closes 11/4/2026Opened 10/14/2026

City of Newport News·Virginia

67% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

Lake Superior State University·Michigan

67% match

Exterior Dock House with Hydraulic Dock Leveler

Closes 11/6/2026Opened 10/28/2026

City of Watsonville·California

67% match

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

Manatee County - Purchasing Division·Florida

67% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

Capital Area Transit System·Louisiana

67% match

2026-FloridaTerminal-003

Closes 12/7/2026Opened 10/22/2026

U.S. Department Of Homeland Security·Florida

67% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026

New York City Department of Education·New York

67% match

Bid Extension: REQUIREMENTS CONTRACT FOR COMPOSTABLE FOODSERVICE PRODUCTS

Rolling / TBD closeOpened 8/15/2024

Muskegon Community College·Michigan

67% match

Request For Bids: MCC Chiller Plant* (Phase 1)

Rolling / TBD closeOpened 9/29/2026

Alaska Department of Transportation and Public Facilities·Alaska

67% match

ITB: AK-2026-26/SFTAG00736 Angoon Ferry Terminal Modifications

Closes 11/3/2026Opened 9/30/2026

Port of Lake Charles·Louisiana

66% match

Bulk Terminal No. 1 Junction House Rehabilitation

Closes 11/19/2026Opened 10/16/2026

City of Muskogee·Oklahoma

66% match

Bid Opening - SH 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

NYCEDC·New York

66% match

Brooklyn Cruise Terminal Upgrades Project

Closes 11/24/2026Opened 10/14/2026