The Hillcrest & Crestmont Drainage Improvement Project involves the construction and replacement of storm drainage pipe, an outfall structure, inlets and manholes, as well as the construction and reconstruction of pedestrian curb ramps and replacement of curb and gutter segments. The project also requires coordination with P.G. & E. for a gas main relocation. The engineer's estimate for the project is $3.0 million, and the apparent low bidder is Preston Pipelines with a total bid of $5,990,000.00.
• The project includes construction and replacement of storm drainage pipe, an outfall structure, inlets and manholes
• The project requires coordination with P.G. & E. for a gas main relocation
• The engineer's estimate for the project is $3.0 million
• The apparent low bidder is Preston Pipelines with a total bid of $5,990,000.00