The City of Olathe, Kansas, awarded a contract to Charlie Brunker Excavating, Inc. for the construction of storm drainage improvements at 15515 S. Keeler St. and 15110 S. Oakmont St. The contract includes work such as grading, berm construction, swale construction, concrete retaining wall installation, and erosion control blanket installation. The contract award amount is $46,719.00.
• The contract includes the construction of 214 L.F. of 3’ berm construction, 34 L.F. of 4’ swale construction, 65 L.F. of concrete retaining wall installation, and 59 L.F. of concrete gutter installation.
• The contract also includes the removal and replacement of existing wood fence, installation of erosion control blanket, and installation of erosion control silt fence.
• The contract award date is March 29, 2011.