Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Construction
  5. ›Airtrans Center Concrete Joint Seal Replacement and Panel…

Port of Portland·Oregon

Airtrans Center Concrete Joint Seal Replacement and Panel Rehabilitation

Closes 4/14/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Port of Portland is seeking qualified contractors to replace concrete pavement joint seals and rehabilitate panels throughout the Airtrans Center (ATC) area at Portland International Airport. The scope includes removal of existing pavement, installation of a lean‑concrete base, placement of new cement‑concrete pavement of varying thicknesses, grinding and spall repair, mid‑panel crack sealing, and installation of liquid‑applied joint sealants. The work also requires traffic control, temporary utilities, erosion‑ and sediment‑control, waste‑recycling, and final close‑out documentation. The contract will be awarded on a fixed‑price, lump‑sum basis with unit‑price items for specific line‑items. • Removal and replacement of concrete and asphalt pavement across the ATC, including full‑panel replacements where required. • Installation of new lean‑concrete base course (4‑6 in.) and cement‑concrete pavement (11‑18 in.) with liquid‑applied joint sealants. • Required site preparation, traffic control, environmental compliance, and close‑out deliverables (as‑built drawings, warranties, certificates).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brandon Alius

[email protected]

Key dates

Opened
3/17/2026
Questions due
4/7/2026
Pre-bid meeting
3/25/2026
Closes
4/14/2026
Duration
140 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
2026-13405

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed. Based on typical airport pavement rehabilitation projects of this size (≈ 140 days, extensive concrete work, traffic control, and environmental compliance), a reasonable estimate ranges from $2 million for a minimal scope to $5 million for a full‑panel replacement with higher‑grade materials and extensive site‑management. Factors influencing the final amount include actual quantities measured in the field, the unit prices for concrete and sealants, and any unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Portland·Oregon

Top match · 71%

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Defense·Pennsylvania

68% match

CONTROL PANEL,AIRCR

Closes 12/9/2026Opened 9/10/2026

City of Chicago·Illinois

68% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

California Department of Transportation·California

68% match

Furnish and place polyester concrete overlays & replace joint seals.

Closes 11/5/2026Opened 10/5/2026

City of Charlotte·North Carolina

68% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

Raleigh Durham Airport Authority·North Carolina

68% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Niagara Frontier Transit Authority (NFTA)·New York

67% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

67% match

CONTROL PANEL,AIRCR

Closes 12/9/2026Opened 9/10/2026

Texarkana Regional Airport·Arkansas

67% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

Raleigh Durham Airport Authority·North Carolina

67% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Port of Portland·Oregon

67% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

67% match

CONTROL PANEL,AIRCR

Closes 11/30/2026Opened 10/30/2026

California Department of Transportation·California

66% match

Apply methacrylate, place polyester concrete overlay and joint seals.

Closes 12/2/2026Opened 10/26/2026

Hillsborough County Aviation Authority·Florida

66% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

66% match

15--DOOR,ACCESS,AIRCRAF, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/22/2026

Port of Portland·Oregon

66% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Raleigh Durham Airport Authority·North Carolina

66% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Wisconsin Department of Transportation Bureau of Aeronautics·Wisconsin

66% match

Repairs to East and West Parking Garages – Dane County Regional Airport (MSN1022 – Contract 4)

Closes 11/19/2026Opened 10/26/2026

Little Rock Municipal Airport Commission·Arkansas

66% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

Georgia Decatur County Board of Commissioners·Georgia

66% match

Rehab Terminal Apron

Closes 11/5/2026Opened 10/5/2026

Jacksonville Aviation Authority·Florida

66% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·Ohio

66% match

62--LIGHT,LANDING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

Port of Portland·Oregon

66% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

Tampa International Airport·Florida

66% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

U.S. Department Of Defense·Virginia

66% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026