The Palm Beach County Board of County Commissioners is seeking a Construction Manager at Risk (CM@R) for the Aqua Crest Pool Complex Renovations project. The project includes the demolition of the existing site and the construction of a new 25-yard by 50-meter pool, a new interactive play pool, and a new building structure to house administration offices, ticketing, guard room, first aid room, weights training, and locker rooms. The selected CM@R will provide pre-construction services, develop a Guaranteed Maximum Price (GMP), and construct the project. The project is estimated to cost $22.5 million and is expected to be completed in 2028.
• The project includes the demolition of the existing main building, weight training building, 50-meter pool with dive well and pump house, wading pool, and pool deck.
• The construction of a new 25-yard by 50-meter pool with a separate dive well and moveable bulkhead.
• The addition of a new interactive 0-2.5’ depth play pool with features below that feeds into a 3.5 – 4’ teaching pool.
• The creation of an adequate deck to host meets and have land drills with artificial grass area for picnic tables and sound amplification throughout.
• The incorporation of non-permeable shade structures such as: shade sail, large umbrellas or cantilevered shade structures on either side of 25 yard pool and near play/teaching pool and in grass area.
• The addition of a multipurpose party/classroom space with the capability of being subdivided into at least two smaller spaces.
• The increasing visibility of aquatic center by removing the existing perimeter wall and replacing it with a green buffer or transparent design element.
• The incorporation of a new marquee sign visible along the main road with messaging capability.