Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›2 Yr On Call Concrete & Flowable Fill-Bridge

Department of Transportation·South Carolina

2 Yr On Call Concrete & Flowable Fill-Bridge

Closes 9/3/2026$10M – $20MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

SCDOT is issuing a two‑year on‑call contract to supply Class 5000 psi concrete and non‑excavatable flowable fill for bridge projects across District 1 counties. The contractor must be able to deliver material on short notice, meet specification standards, and support SCDOT’s bridge construction and repair activities. • Scope: supply of high‑strength concrete (5000 psi) and flowable fill for bridge work in Kershaw, Lee, Lexington, Richland, and Sumter counties. • Contract length: 2‑year on‑call period with multiple call‑outs as needed. • Delivery: material must be delivered to designated SCDOT sites within District 1 on a timely basis. • Requirements: compliance with SCDOT specifications, ability to provide non‑excavatable flowable fill, and maintain inventory for rapid response. • Submission: bids due September 3, 2026 by 2:30 PM; contact Emmett Kirwan for inquiries.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Emmett Kirwan

[email protected]

(803) 737-0676

Key dates

Opened
8/11/2026
Closes
9/3/2026
Duration
2 years

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
327320
Solicitation №
5400030059

Budget estimate

$10,000,000 – $20,000,000

Based on typical market rates for ready‑mix concrete (~$120 per cubic yard) and flowable fill (~$80 per cubic yard), assuming an estimated volume of up to 100,000 cubic yards over the two‑year period, the contract value could range from roughly $10 million to $20 million. This estimate accounts for material costs, transportation, mobilization fees, and regional price variations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Madison·Mississippi

Top match · 67%

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

California Department of Transportation·California

67% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

Central Arkansas Water·Arkansas

67% match

Annual Concrete Surface Repairs – 2027 (30 Day Option)

Closes 11/17/2026Opened 10/18/2026

CPPJ Road, Bridge, & Utility·Louisiana

66% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

LA Public Works Engineering Bureau·California

66% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Branson·Missouri

66% match

RFB 2891-02 Concrete 2027

Closes 11/4/2026Opened 10/5/2026

Caddo Parish Commission·Louisiana

66% match

26-17, Mira Myrtis Road Bridge Replacement Project

Closes 11/12/2026Opened 10/21/2026

City of Vista·California

66% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

California Department of Transportation·California

65% match

Structural Conc, bar Reinf steel, Str Exc, and partially grouted RSP.

Closes 11/19/2026Opened 10/5/2026

Central Arkansas Water·Arkansas

65% match

Annual Concrete Surface Repairs – 2027 (15 Day Option)

Closes 11/10/2026Opened 10/18/2026

Carver County·Minnesota

65% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

County of Marin·California

65% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Meriden·Connecticut

65% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Irving·Texas

65% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

Oregon Department of Transportation·Oregon

65% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Sedgwick County·Kansas

65% match

Bridge Improvements (B515)

Closes 11/3/2026Opened 10/21/2026

City of Minot·North Carolina

64% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

City of Charlotte·North Carolina

64% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

California Department of Transportation·California

64% match

Bridge overlay, approach slab, joint seal, HMA, and cold plane.

Closes 11/10/2026Opened 10/12/2026

The Metropolitan District·Connecticut

64% match

Furnishing Precast Concrete Meter Manholes and Catch Basins

Closes 12/1/2026Opened 10/28/2026

City of High Point·North Carolina

64% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Missouri Department of Transportation·Missouri

64% match

Pulaski County, removal of the existing structure and construction of a new 98’-0” single span bridge with prestressed concrete NU-43 girders, etc.

Closes 11/30/2026Opened 10/30/2026

City of Indianapolis·Indiana

64% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026