Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Civil Engineering
  5. ›Single Source- Modification of Design Documents for Walnut…

Shelby County·Tennessee

Single Source- Modification of Design Documents for Walnut Grove Widening from Rocky Road to Houston Levee Road

Closes 1/8/2026$200k – $500kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Shelby County Government is seeking a single source vendor to modify design documents for the Walnut Grove Widening project from Rocky Road to Houston Levee Road. The scope of work includes redesigning the storm sewer system, adding ROW calls for all easements, developing metes and bounds descriptions, preparing a design exception packet, updating plans and permits, and investigating NEPA CE documentation updates. Interested parties are invited to submit a letter of interest and pricing via email to the procurement contact. The services are to be rendered by December 31, 2026. • Redesign of storm sewer system to conform to new TDOT requirements • Addition of ROW calls for all easements as per new TDOT requirements • Development of metes and bounds descriptions for all easements • Preparation of a design exception packet for submission to TDOT • Updating plans and utilizing extensive TDOT checklists for plans • Investigations into NEPA CE documentation updates • Updating permits and SWPPP documents • Obtain traffic counts at the intersection of Walnut Grove and Houston Levee and updating signal timing • Updating traffic signal design to new standards • Updating surveys based on current conditions and a defined allowance for some future updates • Revising plans to reflect the use of the roadway typical section contained in the approved NEPA document

Attached files

Contact

Sherry Money(Procurement Contact)

[email protected]

Key dates

Opened
12/30/2025
Closes
1/8/2026
Duration
1 year

Last updated

Details

Type
Sole Source
Industry
Civil Engineering
NAICS
541330

Budget estimate

$200,000 – $500,000

The budget for this opportunity is difficult to estimate without more information about the scope and complexity of the project. However, based on the services required, it is likely that the budget will be in the range of $200,000 to $500,000. This estimate is influenced by the fact that the project involves modification of design documents, which may require significant engineering and design work. Additionally, the project requires updating permits and SWPPP documents, which may also incur additional costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of San Antonio·Texas

Top match · 69%

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·Arkansas

69% match

St Francis Town Levee Renovation

Closes 11/23/2026Opened 10/22/2026

City of Fairfield·Ohio

68% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Thornton·Colorado

68% match

Quebec Street Widening - North of 136th Avenue

Closes 11/20/2026Opened 10/1/2026

City of Charlotte·North Carolina

68% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

U.S. Department Of Transportation·Texas

68% match

TX FW LGA 10(5) Steve Thompson Wildlife Drive

Closes 11/3/2026Opened 10/1/2026

Harris County Municipal Utility District No. 538·Texas

68% match

FM 529 Turn Lane, Traffic Signalization, and Driveway

Closes 11/5/2026Opened 10/20/2026

U.S. Department Of Defense·Louisiana

68% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

Bartow County·Georgia

68% match

RFB-26-55-05 Cassville Road Widening Phase II

Closes 11/10/2026Opened 10/9/2026

City of Mason·Ohio

68% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

TOWNSHIP OF WOOLWICH·New Jersey

68% match

Valley Glen Roadway Rehabiliation

Closes 11/10/2026Opened 10/30/2026

Nevada Government·Nevada

68% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Loudoun County Public Schools·Virginia

68% match

Evergreen Mills Rd Widening Improvements

Closes 11/12/2026Opened 9/28/2026

Texas City of San Antonio·Texas

68% match

Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

Texas Jefferson County·Texas

68% match

Garth Road Reconstruction Phase 1

Closes 11/4/2026Opened 10/13/2026

City of Elk Grove·California

67% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

67% match

171_2027 LATEX MODIFIED - SECONDARY

Closes 11/18/2026Opened 10/27/2026

City of Highland Village·Texas

67% match

Highland Shores Boulevard Reconstruction Project

Closes 11/12/2026Opened 9/26/2026

Loudoun County·Virginia

67% match

Route 15 North Widening: Battlefield Parkway to Montresor Road, IFB NG00004

Closes 11/20/2026Opened 10/13/2026

Neel-Schaffer, Inc·Mississippi

67% match

18766 Live Oak Avenue Drainage Improvements#21038

Closes 11/10/2026Opened 10/14/2026

City of Murfreesboro·Tennessee

67% match

Cherry Lane Extension, from east of I-840 to west of I-84 (New Interchange)

Closes 11/3/2026Opened 10/6/2026

City of Cedar Rapids·Iowa

67% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Charlotte·North Carolina

67% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

Township of Mahwah·New Jersey

67% match

MTB #26-03 IMPROVEMENTS TO CORPORATE DRIVE-PHASE 1 AND 2

Closes 11/5/2026Opened 10/8/2026

City of Kechi·Kansas

67% match

Kechi - 61st Street and Woodlawn Widening

Closes 11/2/2026Opened 10/19/2026