Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Construction
  5. ›Callao VFD Site EandS Piping Project

Callao Volunteer Fire Department Inc·Virginia

Callao VFD Site EandS Piping Project

Closes 6/3/2026$150k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Callao Volunteer Fire Department is seeking a contractor to perform site work, erosion and sediment (E&S) control measures, construct a dry pond, develop a pad site, and install underground utilities for its fire department facilities. This effort supports flood mitigation, water storage, and infrastructure improvements needed for fire protection and community safety. • Perform earthwork and grading to prepare the site. • Install E&S controls including silt fences, sediment basins, and storm‑water best management practices. • Construct a dry pond for storm‑water retention and fire‑suppression water supply. • Build a pad site for fire‑department equipment and vehicles. • Lay underground utilities (water, sewer, electrical) to service the new facilities.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

David Woolard(Buyer)

Key dates

Opened
4/9/2026
Closes
6/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB-117301

Budget estimate

$150,000 – $300,000

Based on typical municipal civil‑construction contracts of this scope—site grading, E&S controls, a dry‑pond, pad preparation, and utility installation—the total contract value is likely in the low‑to‑mid six‑figure range. Factors influencing cost include site size, soil conditions, material prices, and local labor rates. A reasonable estimate would be between $150,000 and $300,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 66%

Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)

Closes 11/16/2026Opened 10/7/2026

City of San Antonio·Texas

64% match

6100019820 Carbon Steel Pipe and Accessories

Closes 11/13/2026Opened 10/28/2026

The Metropolitan Water District of Southern California·California

64% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Texas City of San Antonio·Texas

64% match

ANNUAL CONTRACT FOR CARBON STEEL PIPE AND ACCESSORIES FOR PUBLIC WORKS DEPARTMENT

Closes 11/13/2026Opened 10/28/2026

City of Rancho Palos Verdes·California

64% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

Massachusetts Town of Holliston·Massachusetts

64% match

WWTP Yard Piping Phase 1D

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

64% match

STEM,FLUID VALVE

Closes 11/6/2026Opened 10/7/2026

Brazos Valley·Texas

63% match

Upgrade of VFD (Variable Frequency Drive) Control from NXGI to NXGPro+ system

Closes 11/17/2026Opened 10/26/2026

San Francisco Water Power Sewer·California

63% match

WD-2914 Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Pipeline Repairs

Closes 11/19/2026Opened 10/8/2026

Palm Beach County – Facilities Development & Operations·Florida

63% match

PIPE & FITTINGS, DUCTILE IRON, PURCHASE OF, PRE-QUAL, CTYWD

Closes 5/4/2031Opened 7/1/2026

City of Beaumont·California

63% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

City of San Bernardino·California

63% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

San Antonio Water System·Texas

63% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

Southwest Regional Water District·Iowa

63% match

F Ave. 10" Waterline Improvements, Southwest Regional Water District - Clarinda, Iowa

Closes 11/2/2026Opened 9/22/2026

City of Troy, OH·Ohio

63% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

Villages Community Development Districts, FL·Florida

63% match

Sole Source Designation of Ovivo USA, LLC for the Ovivo Suction Pipe Clarifier Type C3s system components

Closes 11/19/2026Opened 10/30/2026

Washington Suburban Sanitary Commission·Maryland

63% match

Potomac WFP Water Quality/PFAS Pilot Project REBID

Closes 12/1/2026Opened 10/14/2026

Western Municipal Water District·California

63% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

City of Vallejo·California

63% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

Washington Suburban Sanitary Commission, MD·Maryland

63% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

School District of Philadelphia (General Opportunities)·Pennsylvania

63% match

On Call Piping Repairs

Closes 1/12/2027Opened 10/30/2026

Greater Cleveland Regional Transit Authority·Ohio

63% match

Dry Fire Piping System Replacement – Hayden District

Closes 11/23/2026Opened 10/19/2026

City of Redlands·California

63% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Fort Bend County Municipal Utility District No. 134A·Texas

63% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

City of Riverside·California

62% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026