The Ohio Department of Rehabilitation and Correction is soliciting bids for the complete renovation of the sally‑port at the southeastern correctional institution in Lancaster, Ohio. The work includes demolition of the existing guard shack, construction of a new slab‑on‑grade concrete guard building using owner‑furnished precast insulated panels, installation of a vehicular gate and pedestrian gates, security fencing, and full integration of mechanical, electrical, plumbing, fire‑protection, and security systems. The contract is a prevailing‑wage, general‑contracting award with a 360‑day construction period.
• Demolition of existing sally‑port and site preparation, including grading, shoring, and temporary facilities.
• Erection of a 1,305 SF precast concrete building (walls, columns, beams, 8‑in. hollow‑core roof) with associated security fencing, gates, and door hardware.
• Installation of all MEP systems (HVAC, water, sewer, gas, fire alarm, CCTV, metal detectors) and integration with the facility’s automation (BAS) and EDGE‑program compliance.
• Coordination of owner‑furnished materials (precast panels, lock sets, security equipment) and delivery logistics, plus required testing, inspections, and documentation.