The United States Department of Agriculture (USDA) is seeking a contractor to demolish and dispose of the existing vault toilet building, handpump well, and campground items at the Klahanie Vault Toilet and Well Removal site in the Olympic National Forest. The project includes improving access, demolishing the existing vault toilet building, concrete foundation, in-ground vault, and removal of the water handpump well. The contractor must also cap the well according to WAC 173-160-381 and properly dispose of debris.
Key aspects of the job include:
• Demolishing the vault toilet building and disposing of the debris
• Removing the handpump well and capping it according to regulations
• Improving access to the site
• Disposing of campground items such as fire rings, picnic tables, and signs
• Ensuring proper erosion control measures are in place
The contractor will be required to provide a licensed well driller for the well decommissioning and must assume all risk, loss, damage, or expense arising out of the prosecution of the work.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.