The University at Buffalo is seeking bids for the renovation of the Special Care and Oral Facial Pain Clinics at Squire Hall. The scope of work includes selective demolition, asbestos/lead abatement, removal of universal wastes and fluorescent lamps, architectural millwork and wood trim, solid surface and quartz countertops, spray applied fire proofing, firestopping, joint sealants, doors/frames/hardware, fire-rated glass, metal stud/drywall/finish, acoustical ceilings, sheet good flooring, resilient flooring and base, ceramic and glass mosaic tiling, resinous flooring, painting/staining, intumescent painting, specialty wallcovering, FRP paneling, interior signage, toilet partitions, wall and corner guards, toilet room accessories, roller window shades. The project is expected to be completed by January 15, 2027.
• Prevailing wage applies
• Tax-exempt
• Completion date: January 15, 2027
• Bid proposals should be forwarded in PDF file format
• Service-Disabled Veteran-Owned Set Aside: No
• Minority Owned Sub-Contracting Goal: 15%
• Women Owned Sub-Contracting Goal: 15%
• Service-Disabled Veteran-Owned Business Contracting Goal: 6%