The U.S. Air Force’s 356th Expeditionary Theater Support Group is seeking sources capable of supplying hot‑mix asphalt, tack coat, and prime coat to support large‑scale airfield rehabilitation at North Field, Tinian (CNMI). The effort requires a production capacity of 100‑240 tons per hour, operating roughly 60 hours per week, with total asphalt volume between 50,000 and 135,000 tons over an estimated 18‑month period. Additional requirements include 25,000‑65,000 tons of prime coat and 27,000‑75,000 tons of tack coat, all meeting Unified Facilities Guide Specification (UFGS) standards. Vendors must provide a fully equipped mixing plant, laboratory‑validated mix designs, calibrated equipment, and a comprehensive quality‑control plan. The contract will involve continuous production, storage, transport, and delivery to RED HORSE paving equipment, with strict temperature, moisture, and testing controls.
• Production capacity: 100‑240 t/hr (≈60 hrs/week)
• Total asphalt: 50‑135 k tons over ~18 months
• Prime coat: 25‑65 k tons; Tack coat: 27‑75 k tons
• Must meet NAICS 324121 and UFGS airfield specifications
• Provide mixing plant, calibrated scales, storage silos, insulated trucks, MTVs, and full QC/QA documentation
• Laboratory accreditation, JMF approval, and USACE validation required
• No reclaimed asphalt or shingles permitted
• Deliver to RED HORSE equipment under COR direction