The State of Colorado, Department of Natural Resources, is seeking quotes for the installation of a high-speed fiber optic backbone and/or lateral connections to the existing Wray Fish Hatchery building and the Office/Visitors Center building. The installation must provide a minimum guaranteed bandwidth capacity of 250Mbps symmetrical to each individual building. The project includes route and installation, civil works and permitting, and acceptance and testing criteria.
• The project requires the installation of a 2" conduit from the Demarcation Point to the designated IT rooms of both the Office and the Hatchery.
• The project includes the provision of vendor networking equipment, including DMARC, router, and switch.
• The project requires the restoration of all disturbed surfaces to an "as-good or better" condition.
• The project includes the provision of "As-Built" drawings/maps detailing the exact underground path of the fiber and the location of all handholes.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.