Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Telecommunications
  5. ›Fiber Optic Outside Plant and Inside Plant Services

Dakota County·Minnesota

Fiber Optic Outside Plant and Inside Plant Services

Closes 11/24/2026$1M – $3MRequest for Proposal
Get bids like this by emailBid source

Description

Dakota County is seeking qualified contractors to provide on‑demand fiber‑optic services for both outside‑plant (OSP) and inside‑plant (ISP) networks. The contract will be a one‑year, non‑exclusive agreement under which the County will issue individual work orders for new builds, fiber relocations, outage break‑fix, and general maintenance. Vendors must submit a rate schedule (hourly, unit rates, etc.) and be able to meet stringent 24/7 outage response SLAs (as fast as 30 minutes for action plans and 2 hours on‑site for critical outages). The County expects contractors to handle design coordination, permitting, excavation, conduit and cable installation, testing, GIS/as‑built updates, material reconciliation, and full documentation. Insurance, compliance with multiple statutes, and adherence to detailed material specifications (conduit sizes, color coding, splice cases, handholes, etc.) are mandatory. • On‑demand OSP & ISP services: new builds, relocations, emergency outage repair, and routine maintenance. • Mandatory 24/7 response: critical outage action plan ≤ 30 min, technician on‑site ≤ 2 hr, full restoration ≤ 4 hr. • Contractors must submit comprehensive rate sheets and be able to provide NTE estimates for each work order. • Required insurance coverage includes workers’ comp, general liability (≥ $2 M), professional liability, automobile liability, and network security liability. • All deliverables (testing reports, as‑built GIS maps, material reconciliation) must meet WCAG 2.1 Level AA accessibility standards.

Attached files

Contact

Cassie O’Tool(IT Project Manager)

[email protected]

Key dates

Opened
10/29/2026
Questions due
11/10/2026
Closes
11/24/2026
Duration
1 year

Last updated

Details

Type
Request for Proposal
Industry
Telecommunications
NAICS
237130

Budget estimate

$1,000,000 – $3,000,000

No fixed contract ceiling is disclosed. Based on a one‑year, county‑wide fiber‑optic service agreement that includes new‑build projects, relocations, and 24/7 outage response, a realistic estimate would be between $1 million and $3 million in total billings. The low end assumes a modest rate schedule and limited work orders; the high end reflects a full‑service provider handling multiple builds, extensive relocation work, and rapid‑response outages throughout the year.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Oregon Confederated Tribes of Siletz Indians·Oregon

Top match · 87%

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

Baltimore County, Maryland·Maryland

86% match

Fiber Optic Construction and Related Services

Closes 1/14/2027Opened 10/21/2026

Oregon Northern Wasco County PUD·Oregon

86% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

NYS Onondaga County·New York

84% match

FIBER OPTIC DESIGN AND OPTIONAL CONSTRUCTION MANAGEMENT

Closes 11/27/2026Opened 10/29/2026

Clemson University·South Carolina

84% match

Emergency Cable Repairs

Closes 2/27/2029Opened 3/20/2024

State of North Dakota Information Technology Department·North Dakota

84% match

122-2707 Wiring & Fiber Placement Services

Closes 11/20/2026Opened 10/27/2026

Iowa Communications Network·Iowa

84% match

PRE-QUALIFY VENDORS WHO CAN PROVIDE TELECOMMUNICATIONS OUTSIDE PLANT SERVICES IN SELECTED ZONES

Closes 11/6/2026Opened 9/5/2026

Michigan Wayne-Westland Community School District·Michigan

84% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026

Clemson University·South Carolina

83% match

Off Campus Fiber Builds

Closes 6/10/2029Opened 6/13/2024

City of Garland·Texas

83% match

Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments

Closes 11/5/2026Opened 10/20/2026

Michigan Caledonia Community Schools·Michigan

82% match

RFP - District Fiber Renovations

Closes 11/20/2026Opened 10/30/2026

Utility Board of the City of Key West·Florida

82% match

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

City of Vallejo·California

81% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Agriculture·Arkansas

81% match

Womble Work Center Fiber Optic Installation

Closes 11/23/2026Opened 10/22/2026

County of Orange·California

81% match

Lighting Maintenance and Repair Services

Closes 11/30/2026Opened 10/29/2026

Nevada Department of Conservation and Natural Resources·Nevada

81% match

NDSP Wifi Services

Closes 11/3/2026Opened 10/9/2026

Dakota County·Minnesota

81% match

Fire Sprinkler Maintenance

Closes 11/4/2026Opened 10/21/2026

Palm Beach County·Florida

81% match

PRE-QUAL FOR FIBER OPTIC CABLE

Closes 6/27/2029Opened 1/23/2026

Georgia Butts County Schools (Butts County School District)·Georgia

81% match

RFP - Fiber Optic WAN Service

Closes 11/27/2026Opened 10/27/2026

Maryland The Secretary’s Office·Maryland

80% match

Fiber Channel Switches

Closes 11/4/2026Opened 9/11/2026

Nevada Government·Nevada

80% match

Annual Requirements Contract for Traffic Signal and Street Light Wire

Closes 11/3/2026Opened 10/12/2026

Massachusetts Town of Leverett·Massachusetts

80% match

The Contractor shall complete repairs, new installations and maintain as builts

Closes 12/7/2026Opened 10/26/2026

Colby Community College·Kansas

80% match

Fiber Installation for Dorm and Maintenance Building (PDF)

Closes 12/1/2026Opened 10/16/2026

U.S. Department Of The Interior·California

80% match

Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up

Closes 11/16/2026Opened 10/30/2026

Columbia Public Schools·Missouri

80% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026