The proposed work includes building a roundabout on Highway 61 and Interstate 55 at exit 170. This work includes but is not limited to new concrete pavement, grading, asphalt pavement on interchange ramps, signage, and striping. The project requires a pre-bid meeting, and all bidders must attend to be considered. The contractor shall have a maximum of 130 working days to complete the project. The project includes requirements for prevailing wage rates, DBE goals, and on-the-job training.
• The project involves building a roundabout on Highway 61 and Interstate 55 at exit 170.
• The work includes new concrete pavement, grading, asphalt pavement on interchange ramps, signage, and striping.
• The contractor must attend the pre-bid meeting to be considered.
• The project has a maximum of 130 working days for completion.
• The project requires compliance with prevailing wage rates, DBE goals, and on-the-job training requirements.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.