The City of Woodstock, GA is soliciting qualified contractors to construct “Streetscapes VI” along Towne Lake Parkway between Mill Street and Main Street (Phase II). The work includes pouring concrete sidewalks, curb & gutter, and driveways; installing storm‑drain pipe and a catch basin; removing an oak tree; and installing brick pavers. All work must comply with GDOT and City standards, be performed by a GDOT‑prequalified contractor (and subcontractors), and be completed within 90 days of a Notice to Proceed. A bid bond (5 % of bid) and performance/payment bonds (100 % of bid) are required, along with general liability, workers’ compensation, and other insurance. The pre‑bid conference is optional (Nov 3, 2026, virtual). Questions are due by Nov 5, 2026; bids must be submitted electronically by Dec 1, 2026, 10:00 AM EST. The contract will be awarded to the lowest responsive bidder, with award expected within 60 days of opening. Liquidated damages of $250 per day apply for late completion.
• Scope: concrete sidewalks, curb‑gutter, driveways, storm‑drain pipe, catch basin, tree removal, brick pavers.
• GDOT pre‑qualification required for prime and subcontractors.
• Bonds: 5 % bid bond; 100 % performance & payment bonds; $1 M/$2 M general liability.
• Insurance: workers’ comp, manufacturers’ liability, contractor liability.
• Timeline: Pre‑bid optional Nov 3 2026; questions due Nov 5 2026; bid deadline Dec 1 2026; award within 60 days; construction 90 days after NTP.
• Mandatory documents: non‑collusion affidavit, E‑Verify certification, conflict‑of‑interest disclosure, etc.
• Penalties: $250/day liquidated damages for overruns.