The Illinois Department of Natural Resources (DNR) is seeking bids for an emergency extension to replace a vault toilet at the Sailboat Harbor Boat Ramp at the Wayne Fitzgerrell State Recreation Area in Whittington, Illinois. The project involves supplying and installing a CXT precast concrete toilet, pumping out existing vaults, demolishing the existing vault toilet, and excavating and grading the site. The successful bidder will be required to provide all materials, labor, and equipment necessary for the project. The base bid for the project is $110,099, with two alternate add options available.
• The project requires a CXT precast concrete toilet with specific features, including simulated barnwood texture walls and a simulated cedar shake texture roof.
• The project involves demolition and removal of the existing vault toilet and concrete apron.
• The project requires excavation and grading of the site, including placement of compacted CA-6 aggregate base and concrete apron.
• The project has two alternate add options, including an upgrade to stainless steel toilet risers and the addition of solar light kits.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.