Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›Addendum 1 Parks Concrete Phase 4b

City of Salina·Kansas

Addendum 1 Parks Concrete Phase 4b

Rolling / TBD close$150k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Salina is seeking competitive bids for “Parks Concrete Improvements Phase 4b,” a municipal construction project that will upgrade sidewalks, curbs, gutters, and concrete pavement across several city parks. The work includes excavation, removal and replacement of existing concrete elements, installation of reinforced 6‑in. concrete pavement, aggregate base placement, traffic control, and seeding of disturbed areas. All work must meet ADA slope criteria, use specified welded‑wire reinforcement, and be completed by early 2027. • Core items: construction staking, mobilization, excavation (≈328 CY), curb & gutter removal/installation (≈48 LF), sidewalk construction (≈1,445 SY total), reinforced concrete pavement (≈563 SY). • Optional alternates cover additional sidewalk repairs, medians, and ramp work at specific parks (Kenwood, Bill Burke, Sunset). • Required technical specs: W2.9×W2.9 welded wire reinforcement (42 lb/100 sf), AB‑3 aggregate for base, ADA‑compliant slopes, and traffic‑control provisions. • Schedule: bid opening May 28 2026; substantial completion March 1 2027; final completion April 1 2027.

Attached files

Key dates

Opened
5/27/2026
Closes
Rolling / TBD
Duration
9 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
26105

Budget estimate

$150,000 – $300,000

No contract value is disclosed; based on typical unit costs for municipal concrete work (e.g., $110‑$130 per square yard for reinforced pavement, $45‑$55 per square yard for sidewalks, $30 per cubic yard for excavation, $30 per linear foot for curb/gutter) and the quantities listed, a rough estimate ranges from $150,000 to $300,000. This accounts for material, labor, equipment, and overhead, with the upper bound reflecting potential cost overruns or higher unit rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Gabriel Unified School District·California

Top match · 73%

2026-Bid-SG-05_Addendum Three_Drawing - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

City of Louisville·Colorado

72% match

Addendum

Rolling / TBD closeOpened 10/23/2026

Borough of Eatontown·New Jersey

70% match

Meadowbrook School Parking Lot Improvements - Addendum No. 1

Rolling / TBD closeOpened 7/30/2026

City of Helena·Montana

70% match

2026 Sidewalk Improvement Program RFP

Rolling / TBD closeOpened 3/11/2026

Florida Department of Environmental Protection (DEP)·Florida

70% match

Addendum #1: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild

Closes 11/19/2026Opened 10/28/2026

San Gabriel Unified School District·California

69% match

2026-Bid-SG-03_AddendumTwo_Narrative_GabrielinoHSSmallGymDemo

Rolling / TBD closeOpened 6/5/2026

City of Lowell·Massachusetts

69% match

Saint Louis Park Phase 2, addenda 3 issued

Closes 11/4/2026Opened 10/7/2026

City of Galesburg·Illinois

69% match

Addendum 1 - Class 7 Dump Truck Cab/Chassis for the Park Division

Closes 11/4/2026Opened 10/22/2026

Burlington Township·New Jersey

69% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

Northern Virginia Parks·Virginia

68% match

Addendum 2

Rolling / TBD closeOpened 10/28/2026

Calhoun County Board of County Commissioners·Florida

68% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Dillon·South Carolina

68% match

City of Dillon bathroom and concession addendum 1

Closes 11/16/2026Opened 9/22/2026

City of Detroit Demolition Department·Michigan

68% match

Addendum Three: RFQQ SQM Questionnaire

Closes 12/31/2026Opened 7/7/2023

Burlington Township·New Jersey

68% match

Burlington Township-Burlington City CP Addendum #1

Rolling / TBD closeOpened 4/20/2026

Northern Virginia Parks·Virginia

68% match

Addendum 1

Rolling / TBD closeOpened 10/23/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

67% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/29/2026

Town of Lexington·South Carolina

67% match

ADDENDUM 2 CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2027Opened 10/27/2026

City of Helena·Montana

67% match

6th Ward ADA Ramps Project

Rolling / TBD closeOpened 3/11/2026

City of Vista·California

67% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

Los Angeles County Public Works·California

67% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Madison·Mississippi

67% match

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

City of Tustin·California

67% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

City of Martinsburg·West Virginia

67% match

Martinsburg Skate Park

Closes 12/3/2026Opened 10/15/2026