Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›East Access Road Repairs at Union Village Dam, Thetford, VT

U.S. Department Of Defense·Vermont

East Access Road Repairs at Union Village Dam, Thetford, VT

Closes 8/25/2026$350k – $700kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is seeking a certified small‑business contractor to repair and reconstruct a segment of the East Access Road at Union Village Dam in Thetford, VT, including roadway resurfacing, drainage ditch repair, and installation of a new precast concrete box culvert with associated headwalls, wingwalls, and energy dissipator. The contract is a firm‑fixed‑price, one‑year performance with an optional bid item for full pavement removal and replacement. • Repair of existing gravel and asphalt‑paved road segments, plus riprap‑lined drainage ditch. • Removal and disposal of an existing large‑diameter pipe culvert and concrete drop‑inlet structure; install new precast concrete box culvert, headwalls, wingwalls, and rock‑riprap energy dissipator. • Earthwork, grading, topsoil seeding, and erosion‑control measures; optional full pavement removal and hot‑mix asphalt replacement. • Small‑business set‑aside (SBA) with a project magnitude estimated between $350 k and $700 k; performance period 365 days.

Attached files

Contact

Brian Mannion

[email protected]

(978) 318-8478

Key dates

Opened
8/27/2026
Closes
8/25/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
W912WJ26BA020

Budget estimate

$350,000 – $700,000

The solicitation states the estimated project magnitude is between $350,000 and $700,000. Considering the scope—road resurfacing, culvert replacement, drainage improvements, and optional full pavement removal—the low end reflects a minimal repair package, while the high end includes the optional bid items and full pavement reconstruction. Thus, the expected contract award value should fall within that $350‑$700 k range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Vermont Agency of Transportation - Contract Administration·Vermont

Top match · 66%

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/21/2026

Connecticut City of Norwich·Connecticut

66% match

REHABILITATION OF A 0.41 MILE SECTION OF HUNTERS ROAD AND CULVERTS REPLACEMENT

Closes 11/27/2026Opened 9/21/2026

Agency of Transportation - Contract Administration·Vermont

66% match

Norwich-Bradford IM 091-2(99)

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Agency of Transportation - Contract Administration·Vermont

66% match

Mt. Holly BO 1443(56)

Closes 11/13/2026Opened 10/21/2026

Town of Bennington·Vermont

65% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Vermont Agency of Transportation - Contract Administration·Vermont

65% match

Mt Holly BO 1443(56)

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Oregon

65% match

JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4

Closes 11/19/2026Opened 10/20/2026

Agency of Transportation - Contract Administration·Vermont

65% match

Northfield – Williamstown STP Surf (76) Randolph STP SURF(78)

Closes 11/6/2026Opened 10/14/2026

Vermont Agency of Transportation - Contract Administration·Vermont

65% match

Plymouth ER P23-1(327)(328)

Closes 11/13/2026Opened 10/21/2026

Agency of Transportation - Contract Administration·Vermont

65% match

Mt.Holly BO 1443(56)

Closes 11/13/2026Opened 10/21/2026

Massachusetts Department of Transportation·Massachusetts

65% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Agency of Transportation - Contract Administration·Vermont

64% match

Topsham BF 031-1(13)

Closes 11/13/2026Opened 10/21/2026

Miami-Dade County·Florida

64% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

Agency of Transportation - Contract Administration·Vermont

64% match

Berlin-East Montpelier NH PS26(10)

Closes 11/6/2026Opened 10/14/2026

Agency of Transportation - Contract Administration·Vermont

64% match

Chester REGM2347

Closes 11/6/2026Opened 10/14/2026

Gwinnett County Government·Georgia

64% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Georgia Fayette County Board of Commissioners (Purchasing Department)·Georgia

64% match

27043-B: Lake McIntosh Dam Structural Repairs

Closes 11/19/2026Opened 10/13/2026

Trumbull County, OH·Ohio

64% match

TRU-GENESE AVENUE/ ELM ROAD INTERSECTION IMPROVEMENTS

Closes 11/23/2026Opened 10/30/2026

Virginia Department of Transportation·Virginia

63% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

Agency of Transportation - Contract Administration·Vermont

63% match

Bridgewater ER P23-1(424)

Closes 11/20/2026Opened 10/28/2026

Virginia Polytechnic Institute and State University·Virginia

63% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of Hampton·Virginia

63% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/29/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

63% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026