The City of Sacramento is seeking a contractor to design‑build and construct a full‑trash‑capture system at “Site 144” on the I‑80 North Ditch, including a manufacturer‑prefabricated weir, concrete channel work, access roads, fencing, guardrails, and related civil works. The contract is a competitive sealed‑bid public‑works procurement with a $2 million engineered estimate, a 200‑working‑day schedule, and liquidated damages of $2,000 per day for delays. Key requirements include a 10 % bid security, performance and payment bonds equal to 100 % of the contract price, compliance with California labor, environmental, and safety regulations, and a minimum 5 % Local Business Enterprise participation.
• Scope: design‑build installation of a certified trash‑capture system, concrete channel, weir, access road, fencing, guardrails, erosion‑control, and landscaping.
• Schedule: pre‑bid meeting 24 Sep 2026; bid deadline 21 Oct 2026 2 PM; work must be completed within 200 working days after notice to proceed (≈ 9‑10 months).
• Requirements: 10 % bid security, 100 % performance & payment bonds, $2 M insurance minimums, LBE participation, DIR registration, prevailing‑wage compliance, and extensive reporting (weekly payroll, waste logs, etc.).