The University of Maryland, College Park is seeking qualified trade contractors to execute a comprehensive renovation of Hagerstown Hall (8075 Hagerstown Lane, College Park, MD). The project includes mechanical upgrades, window and roof replacement, piping infrastructure renewal, and bathroom improvements, with additional trade packages covering cleaning, inspections, abatement, demolition, masonry, steel, roofing, doors, frames, hardware, drywall, carpentry, HVAC, plumbing, electrical, and sprinkler systems. Construction is scheduled to run from early January 2027 through the end of July 2027. The solicitation requires pre‑qualification, a pre‑bid conference, and a site walk on September 2 2026. The University mandates 20 % MBE participation (including 8 % African‑American and 5 % women‑owned) and prevailing‑wage compliance.
• Primary location: Hagerstown Hall, College Park, MD
• Bid packages: multiple trade‑specific scopes (e.g., HVAC, electrical, plumbing, roofing, masonry, etc.)
• Key dates: Pre‑bid conference & site walk – Sept 2 2026; RFI deadline – Sept 2 2026 4 PM; Bid submission – Sept 11 2026 3 PM
• Construction period: Jan 4 2027 – July 31 2027 (≈7 months)
• MBE requirement: 20 % overall, with sub‑goals for African‑American and women‑owned firms
• Submission: Email or BuildingConnected; pre‑qualification forms mandatory
• Contact for procurement: Jennifer Cruz (
[email protected])
• Trade‑specific contacts available through Davis Construction team for questions.