Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Waste Removal and Collection
  5. ›DOC-26-088 - James River Water Treatment - 10-inch Flow…

Department of Corrections·Virginia

DOC-26-088 - James River Water Treatment - 10-inch Flow Control Valve Rebuild (3)

Closes 5/12/2026$150k – $270kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Virginia Department of Corrections is seeking a contractor to service three 10‑inch flow control valves at the James River Water Treatment Plant. The work includes removing each valve, rebuilding it to operational condition, and reinstalling the rebuilt valve back into service. This is a Quick Quote solicitation and attendance at a mandatory pre‑bid conference is required. The contract must be submitted by the closing date. • Remove, rebuild, and reinstall three (3) 10‑inch flow control valves • Work performed on‑site at the James River Water Treatment Plant • Mandatory pre‑bid conference (date not provided) • Submission deadline: May 12, 2026, 2:00 PM UTC • Procurement type: Quick Quote (Request for Quotation)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kimberlee Hall

Key dates

Opened
4/29/2026
Closes
5/12/2026

Last updated

Details

Type
Request for Quotation
Industry
Utilities and Waste Management
NAICS
811310
Solicitation №
QQ-119237

Budget estimate

$150,000 – $270,000

Based on typical costs for valve rebuilds (including labor, parts, testing, and travel), each 10‑inch flow control valve rebuild can range from $50,000 to $90,000. For three valves, the total contract value is likely between $150,000 and $270,000. The estimate considers the specialized nature of water‑treatment plant equipment, the need for qualified technicians, and the regional labor rates in Virginia.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richland·Washington

Top match · 74%

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

U.S. Department Of Defense·United States of America

73% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 12/15/2026Opened 9/16/2026

U.S. Department Of Defense·Virginia

73% match

James River Dredging Industry Day-Post Event Docs

Closes 11/24/2026Opened 11/20/2025

U.S. Department Of Defense·Oregon

72% match

JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

72% match

STEM,FLUID VALVE

Closes 11/23/2026Opened 10/26/2026

Gloucester County·Virginia

71% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

71% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

New York City Department of Environmental Protection·New York

71% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

71% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

71% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

U.S. Department Of Defense·United States of America

71% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/3/2026

North Carolina Orange Water and Sewer Authority·North Carolina

71% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

71% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Clean River Partners·Minnesota

70% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

County of Ontario·New York

70% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

New York City Department of Environmental Protection·New York

70% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

U.S. Department Of Defense·New Hampshire

70% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Washington

70% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

70% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

New York City Department of Design and Construction·New York

70% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

Prince William County Service Authority·Virginia

70% match

IFB SA 2707-General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

City of Stillwater·Oklahoma

70% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

City of Ontario·California

70% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026