Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Multiple Marina Piling Replacement - Central of Tamiami…

Miami-Dade County·Florida

Multiple Marina Piling Replacement - Central of Tamiami Trail to SW 120th Street

Closes 6/25/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This Contract is intended to provide services on an as-needed basis across multiple locations within Miami Dade County Park Facilities, as may be requested by the Owner. This is a blanket project which is work order driven. The RPQ term shall be three hundred sixty-five (365) calendar days, or until the not-to-exceed contract allocation is fully expended, whichever occurs first. The purpose of this solicitation is to establish a contract for the replacement of Marine Pilings, with Pearson Fiberglass Composite (Brown in color) or approved equal. This contract will be replacing existing pilings throughout all of Miami Dade County Parks and Recreation Marinas within Central of Tamiami Trail to SW 120th Street. 1 CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade County Park & Recreation Construction Division for work to be completed. Furnish all labor, equipment and materials required. 2 Contractor shall be responsible for attaining all pertinent permits from any and all governing entities (i.e., City of Miami, Miami-Dade RER, Electrical, Plumbing, Miami-Dade Public Works, Miami-Dade Water & Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida Water Management, US Army Corps of Engineers, Florida Department of Environmental Protection, USCG etc.) needed to begin and complete all phases of work. 3 If applicable, prior to starting project, CONTRACTOR shall notify any departments having jurisdiction of the work being performed. 4 CONTRACTOR shall comply with Office of Resilience initiatives, to include Sea Level Rise. 5 Contractor shall coordinate all required inspections/tests and documentation required by any/all governing entities, i.e., City of Miami, Miami-Dade Building Department, etc. 6 It shall be the contractor’s responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. 7 Contractor shall use silt barrier, turbidity barriers or any other form of erosion control necessary to avoid contaminating boat basin area. 8 All new pilings being installed shall be Pearson Fiberglass Composite or equivalent. All substitutions shall be submitted to the Miami Dade County Project Manager 9 Due to sea level rise, all new pilings shall be raised up 3 feet above existing pilings’ elevation. 10 The contractor shall notify the project manager prior to starting the job. 11 All new Fiberglass Composite being installed shall be the approximate diameter as existing wood pilings. Existing size to be identified and new piling size shall be approved prior to installation. 12 Contractor shall complete site visit for inspection of existing damage square pile for replacement to match existing in size, dimension, and structural bearing specifications with same materials. 13 All new pilings shall be driven to equal/greater depth of existing pilings being removed to prevent leaning, swaying, twisting, etc. 14 Piles which require excessive bending in order to straighten shall be withdrawn and re-installed to the proper vertical upright position. (Piles shall not be installed and then pulled into position). 15 Contractor shall be required during installation of new piling to be monitored by pile driving report/records submitted by location to ensure minimum driving resistance, record of depth to existing pilings which were removed, record total length to include above ground height/elevation to equal depth/embedment. All requests for information (RFI) must be submitted in writing by 06/15/2026 to [email protected] and copy the Clerk of the Board at [email protected]. NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representative that are not contained in an RPQ or addendum to the RPQ are not binding on the County and should not form any basis for a bidder’s response to an RPQ. Contractor must refer to the Request for Price Quotation (RPQ) and associated project

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
5/22/2026
Closes
6/25/2026

Last updated

Details

Industry
Construction
NAICS
238910

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 79%

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

77% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

74% match

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 9/15/2025

Miami-Dade County·Florida

70% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 9/15/2025

Miami-Dade County·Florida

68% match

Multiple Marina Construction and Repairs - South of SW 120th St to County line

Closes 11/10/2026Opened 10/22/2026

City of Cincinnati·Ohio

66% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of The Interior·Colorado

65% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

City of Key West·Florida

64% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

New York City Department of Parks & Recreation·New York

64% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

City of Gainesville - Procurement Division·Florida

64% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Miami-Dade County·Florida

64% match

Multiple Marina Construction and Repairs - South of SW 120th St to County line

Closes 11/10/2026Opened 9/15/2025

Howard County, Office of Procurement·Maryland

64% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

Kenosha County·Wisconsin

63% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Riverside·California

63% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Cobb County·Georgia

63% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Elko·Nevada

63% match

HARP Trail Extension-Re

Closes 11/2/2026Opened 8/25/2026

City of Melbourne·Florida

63% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

Iowa City·Iowa

63% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Mobile·Alabama

63% match

Critical Repair - 625 Ivis Avenue - Roof Replacement

Closes 11/10/2026Opened 10/28/2026

City of Hesperia·California

62% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

City of Green Bay·Wisconsin

62% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Agriculture·California

62% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

U.S. Department Of Defense·Michigan

62% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

Alaska Department of Transportation & Public Facilities·Alaska

62% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

City of Fort Myers·Florida

62% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026