Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kentucky guideKentucky Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kentucky
  4. ›Construction
  5. ›L&N Stadium Premium Box Wall Renderings

University of Louisville·Kentucky

L&N Stadium Premium Box Wall Renderings

Closes 6/2/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Louisville is seeking a qualified contractor to design, fabricate, and install an exterior architectural screen‑wall system for the premium box area of the L&N Football Stadium. The work includes providing architectural services, obtaining all required permits, fabricating custom aluminum battens and a top‑rail system, and completing installation in accordance with owner‑provided renderings and shop drawings. The contractor must also submit shop drawings, coordinate with the Physical Plant, and provide a one‑year warranty on parts and labor. • Install ~240 linear ft of aluminum battens (2” × 6” × 8 ft) with a black metallic finish, vertically mounted and capable of supporting signage. • Provide full architectural services (design drawings, permitting, coordination) and secure all permits/inspections. • Fabricate battens and custom top‑rail, install using mechanical anchorage to existing concrete floor and ceiling, and ensure plumb, level, and square installation. • Deliver required submittals, maintain daily site check‑ins, and comply with university safety, OSHA, and COVID‑19 protocols.

Attached files

Contact

Jamie Peck(Contract Specialist)

[email protected]

Key dates

Opened
5/8/2026
Questions due
5/22/2026
Pre-bid meeting
5/21/2026
Closes
6/2/2026
Duration
3 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
1196979

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed. Based on the scope (240 ft of custom‑fabricated aluminum battens, design services, permitting, and full installation) and typical market rates for specialty façade work (approximately $2,000–$5,000 per linear foot plus design and labor), the total contract value is likely between $500,000 and $1,500,000. Factors influencing the range include material costs, labor rates, complexity of structural anchorage, and any additional site‑specific requirements (e.g., after‑hours work, safety measures).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

St. Lucie County - Purchasing Department·Florida

Top match · 62%

MLB Stadium (Clover Park) Concrete Traffic Coating

Closes 11/18/2026Opened 10/25/2026

The University of Iowa·Iowa

61% match

Kinnick Stadium and Paul W. Brechler Press Box – LED Replacement

Closes 11/3/2026Opened 10/6/2026

Arizona State University·Arizona

60% match

Athletic Venue LED Display Solutions

Closes 11/3/2026Opened 10/6/2026

Brazos Valley·Texas

60% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

University of Wyoming·Wyoming

60% match

Stadium LED Video Board Upgrades

Closes 11/13/2026Opened 10/22/2026

City of Lincoln·Nebraska

60% match

Carpet Enhancements for Pinnacle Bank Arena

Closes 11/4/2026Opened 10/21/2026

Uw La Crosse·Wisconsin

60% match

UW-La Crosse Gymnasium and Field House Painting Projects

Rolling / TBD closeOpened 2/3/2014

Texas A&M University-Kingsville·Texas

60% match

- LED Wall for TAMUK

Closes 11/7/2026Opened 10/23/2026

City of Little Rock·Arkansas

59% match

ITB - 259545 – Construct Disc Golf Tee Boxes

Closes 11/16/2026Opened 10/25/2026

North Carolina State University·North Carolina

59% match

Athletic Paint

Closes 11/13/2026Opened 10/30/2026

City of Pasadena·California

59% match

Rose Bowl Stadium Architectural Services

Closes 11/5/2026Opened 9/15/2026

Quitman Public School·Arkansas

59% match

Quitman Public School 4‑Sided RGB LED Video Display Purchase

Rolling / TBD closeOpened 8/16/2026

Texas A&M University‑Kingsville·Texas

59% match

LED Wall for TAMUK

Closes 11/7/2026Opened 10/23/2026

University of Louisiana Monroe·Louisiana

59% match

ULM Baseball Field Lighting

Closes 11/4/2026Opened 9/17/2026

Lansing Board of Water & Light·Michigan

59% match

Call for Art

Closes 11/20/2026Opened 9/4/2026

University of North Carolina Wilmington·North Carolina

58% match

Design, Fabrication, Delivery, and Installation of Wall Graphics and Smaller Signs

Closes 11/17/2026Opened 10/13/2026

University of Arkansas at Monticello·Arkansas

58% match

Request for Qualifications: Architects

Closes 11/5/2026Opened 10/17/2026

Colorado PPSC – the solicitation appears to be issued by “PPSC” (likely a public procurement agency).·Colorado

58% match

PPSC DQ 27-006 Operable Wall Partitions

Closes 11/13/2026Opened 10/21/2026

University of Arkansas at Monticello·Arkansas

58% match

Notice to Architects - Weevil Football Stadium

Closes 11/5/2026Opened 10/21/2026

City of North Charleston·South Carolina

58% match

RFQ Architectural and Engineering Services for Renovations and Captial Improvements at the North Charleston Coliseum Complex

Closes 11/5/2026Opened 10/2/2026

West Virginia University·Virginia

57% match

Milan Puskar Stadium West Tower - 01_06 Concrete

Closes 11/10/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

57% match

DISPLAY,FLAT PANEL

Closes 11/24/2026Opened 9/25/2026

City of Grand Forks·North Dakota

57% match

Alerus Center Scoreboard

Closes 11/12/2026Opened 10/14/2026

Lewis-Clark State College·Idaho

57% match

LC270002 – P1FCU Activity Center – Basement Flooring Replacement

Closes 11/5/2026Opened 10/10/2026

City of Ely, MN·Minnesota

57% match

City Hall – Building Envelope Improvements and Stair Repairs

Closes 11/10/2026Opened 10/16/2026